Field notes
GPS boundary survey vs satellite imagery for a cutblock perimeter check

Every certification cycle, somebody on the review team asks the same question: do we send a crew out with a GPS unit, or do we just look at the imagery? The two tools answer different questions, and conflating them is how an audit either runs over budget or misses a real incursion.
What a differential GPS survey actually confirms
A ground crew running RTK or post-processed DGPS can tie a corner pin down to centimeters, given good satellite geometry and a clear sky view. That precision is why a GPS boundary survey stays the instrument of record when a boundary is disputed, when a corner needs re-monumenting, or when a violation finding has to hold up in a hearing. Nobody wins an appeal by waving a satellite image at a judge.
What it doesn't do is cover ground fast. Walking or driving a perimeter, logging shots at each break point, and processing the data against the legal description takes a crew a day or more per block, longer on steep terrain or gated access. On a renewal cycle with forty or sixty active cutblocks, nobody puts a survey crew on all of them. Something has to decide which blocks get the trip, and right now that something is usually a complaint, a random sample, or whichever block the district office happened to drive past.
What imagery-based change detection actually tells you
High-resolution satellite or aerial imagery, run as change detection against the permitted cutblock and riparian buffer polygons, does the opposite job. It covers the whole permit area in one pass, flags where the actual cut extends past the permitted line or into the buffer setback, and does it from a desk, on a schedule, without waiting on ground access or a tip-off.
It is not a legal survey. A flagged boundary from a satellite pass won't stand in for a monumented corner, and nobody should try to use it that way in a hearing. What it's good for is triage: turning "we have sixty permits to check this quarter" into "these four blocks show overcut area or buffer incursion worth a field look, the rest don't." That's remote boundary verification in the sense that matters to a compliance reviewer, a first pass that tells the GPS unit where to go, not a replacement for it.
Picking the right tool for a cutblock perimeter check
Imagery runs the wide scan and narrows the list. DGPS does the final confirmation on whatever the scan turns up, and backs any formal finding with survey-grade numbers. Run it the other way, survey crews first with no prioritization, and that's how a field budget gets spent confirming blocks that were already compliant while the one with a real buffer incursion sits three permits down the unvisited list.
If the current process is field-audit-only, a quarterly pass that compares actual cut boundaries against the permitted cutblock and buffer and hands back a reviewable list of flagged blocks is what Harvest Compliance does before anyone drives out with a GPS unit.
Worth asking before the next cycle: how many of this quarter's field visits got picked because of a flag, and how many got picked because a crew had to go out there anyway.
Send us your next permit renewal list and we'll show you what a first-pass flag looks like before the crews roll.