Blog

Field notes

Notes on cutblock audits, riparian buffers and planning a compliance review.

  1. How to verify soil disturbance limits on a cutblock from satellite imagery

    Checking exposed mineral soil against the disturbance standard without a transect crew: what satellite imagery can and can't tell you before you drive out.

  2. Adjacency requirements: why a neighboring cutblock's harvest date can slip

    What an adjacency requirement checks, how green-up delay gets calculated, and why a shifted cut boundary can push back the block next door.

  3. Field notes: the cutblock that looked clean from the air and wasn't

    A compliance walk-through on why orthophotos pass a block that the tape measure won't, and what that gap costs an auditor's week.

  4. Setting an overcut tolerance threshold before you flag a boundary

    How to build an overcut tolerance threshold from survey accuracy, imagery resolution, and buffer sensitivity before sending a block to field review.

  5. Documenting a riparian buffer incursion: what belongs in the violation file

    A field-ready checklist for documenting a riparian buffer incursion for a forest practices violation file, from measurements to chain of custody.

  6. Overcut vs survey error: reading a cutblock boundary mismatch before you write the notice

    How to tell whether a cutblock boundary mismatch is overcut or a survey error, and what to confirm before issuing a notice of non-compliance.

  7. Field notes: the quarter the cut outran the permit

    A field-notes look at why cutblock overcuts so often surface after the evidence is gone, and what closing the harvest-to-verification gap actually takes.

  8. GPS boundary survey vs satellite imagery for a cutblock perimeter check

    DGPS survey and satellite change detection answer different questions for a cutblock audit. Here's which one to use and when.

  9. RMZ vs RRZ: what's the difference in a riparian buffer?

    RMZ and RRZ show up on the same permit but carry different harvest rules. Here's how the two zones differ and why that matters at audit time.

  10. Net area to be reforested: why it shrinks a cutblock's permitted boundary

    Gross block area and net area to be reforested aren't the same line. Here's how NAR deductions change what a boundary audit should flag.

  11. Field notes: the block that looked compliant until we checked the buffer width

    A field note on a cutblock whose outer line tracked the permit boundary while its stream buffer pinched to nothing along one meander.

  12. Leave strip vs. riparian buffer: telling them apart on a permit

    Leave strip vs. riparian buffer explained for anyone auditing cutblock boundaries against a permit, including why the distinction changes the violation.

  13. Major vs. minor non-conformance in FSC audits, explained

    How FSC audits classify major vs. minor non-conformances, what CARs require, and how surveillance differs from recertification audits.

  14. Free-growing declarations: what the paperwork claims vs what surveys verify

    What a free-growing declaration certifies, how stocking surveys test it, and why silviculture and free-growing checks are not the same assessment.

  15. Minor boundary adjustment or permit amendment? Where the line sits

    How auditors tell a minor boundary adjustment from a cutting permit amendment, and why area and intent, not distance, set the variance tolerance.

  16. What is a wildlife tree retention area, and how do auditors check the boundary?

    A field guide to WTRA compliance: what a wildlife tree retention area is, what the permit requires, and how the boundary gets checked.

  17. How often should cutblock boundaries be reinspected?

    There's no fixed cutblock reinspection frequency. Here's how base cycles, risk triggers, and remote review shape the compliance monitoring cycle.

  18. How to calculate overcut area from a cutblock permit

    A step-by-step method for finding overcut area and buffer incursions from a cutblock permit, from reference boundary to GIS overlay.

  19. What counts as a reportable boundary deviation in forest practices

    What makes a cut boundary deviation reportable under forest practices rules, where thresholds come from, and why riparian buffers get judged differently.

  20. What is a riparian buffer incursion?

    A plain explanation of what counts as a riparian buffer incursion, why it happens, and how compliance reviewers catch it before a field visit.