A boundary mismatch on a post-harvest overlay doesn't tell you anything on its own. The polygon for the permitted cutblock sits a few meters inside the polygon for the actual cut, and now you have to decide whether that's an overcut you need to write up or a survey error you should let the licensee correct on paper. The overcut vs survey error question comes up on nearly every boundary discrepancy review that lands on a desk, and getting it wrong in either direction costs you. Issue a notice of non-compliance that doesn't hold up and you've burned credibility with the licensee and your own file. Let a real boundary violation sit for another quarter because you assumed it was survey noise, and the next cut just pushes the line further.

Here's what separates the two, and what to check before you draft anything.

What a boundary discrepancy actually looks like on the overlay

A true survey error usually shows up as a consistent offset. The actual cut line runs parallel to the permitted line for the entire length of a side, off by roughly the same distance at every vertex. That pattern matches what happens when a cruiser's traverse closes on an old corner post that's shifted, or when a bearing was carried forward from a datum that doesn't match the current cadastral control. If you walk the mismatch and it tracks evenly along a straight run of boundary, with no bulge toward merchantable timber and no relationship to skid trails or landings, that's the signature of a plotting or monumentation problem. Nobody cut past their pins for that.

Check whether the licensee has filed an as-built survey for the block. If the as-built reconciles the permit polygon against a resurveyed corner and the resulting correction matches the overlay mismatch you're seeing, you have your answer. A clerical or survey-closure error gets corrected on the record. It isn't grounds for a notice.

What actual overcut looks like instead

Real overcut doesn't track the whole boundary evenly. It shows up as a localized intrusion, a notch or bulge on one segment of the line, usually where the terrain flattens out, a stand of better timber sits just past the cut line, or a landing crosses into the buffer. It tends to line up with equipment access rather than with the shape of the permit polygon, because crews don't overstep a boundary uniformly for no reason. If the mismatch is biggest right where the riparian buffer narrows, or where the cutblock corner is hardest to flag and reflag in the field, that's not a survey artifact.

Buffer incursion cases are usually the cleanest read. A riparian setback is a fixed distance from a watercourse. It has no corner posts and no traverse to question, so there's no plausible monumentation argument for why the cut ran into it. If the overlay shows timber removed inside the buffer and the licensee's filed plan shows the watercourse where you'd expect it, that's overcut.

Before you write the notice

Confirm three things, not assume them. Does the mismatch track the full boundary line or just one section of it. Is there a filed as-built or corrected survey that accounts for the offset. Does the pattern of the mismatch correlate with harvest activity, landings, skid trails, timber quality, rather than with the shape of the permit polygon itself. If all three point toward a localized, activity-correlated intrusion with no survey record to explain it, you have grounds to proceed. If the offset is uniform and a corrected survey is already on file, send it back for a paper fix instead of a field notice.

None of this replaces walking the corner posts when a case is close. But most of the boundary discrepancies that cross a desk in a quarter aren't close calls once you've got a clean overlay of the as-cut boundary against the permit polygon and the buffer, and most resolve from the pattern alone. Harvest Compliance runs that comparison every quarter and hands back a flagged list of overcut area and buffer incursions, so the ones worth an inspector's time are the ones you actually send someone out for.

If you're spending field days sorting survey noise from real boundary violations, it's worth seeing what that quarterly list looks like for your own permit area.

Start a project